UPAYA PERBANKAN MENGHINDARI EKSEKUSI HAK TANGGUNGAN TERHADAP KREDIT DEBITUR YANG MACET (STUDI KASUS BANK SUMUT CABANG KISARAN)

Ahmad Husni Panjaitan, Indra Perdana

Abstract


With regard to the contract between the Public Works Office of Tanjungbalai City as the first party and the contractor as the second party, in its implementation it is necessary to see whether or not it is in accordance with the substance of the contract that has been agreed upon, so as not to cause harm to other parties. Among the implementation of the contract which is not in accordance with the substance of the contract is that if the second party cannot complete the work according to the agreed time, then also during the trial period and after the handover is also imperfect in making repairs. Thus, the second party has defaulted, because it did not do what was promised.

Key words: Public Works, Contractors and Defaults Office.


Full Text:

PDF

References


Ahmadi Miru, Hukum Kontrak Perancangan Kontrak, (PT. Raja Grafindo Persada, Jakarta, 2010).

Munir Fuady, Pengantar Hukum Bisnis, (Bandung: PT. Citra Aditya Bakti, 2002).

Peter Mahmud Marzuki, Penelitian Hukum, Edisi Pertama, Cet. VII, Kencana Prenada (Jakarta, Media Group, 2011) Salim H.S, Perkembangan Hukum Kontrak Innominaatdi Indonesia, (Jakarta: Sinar Grafika, 2010).

Subekti, Hukum Perjanjian. (Jakarta: Intermasa, 2001).

Wawancara dengan Bapak Ucok Syahputra, S.T. (Kepala Seksi Peralatan dan Pemeliharaan Dinas Pekerjaaan Umum dan Penataan Ruang Kota Tanjungbalai), Pada tanggal 13 Agustus 2020


Refbacks

  • There are currently no refbacks.