Vol 2, No 2 (2023)
MEI 2023
DOI: https://doi.org/10.36294/batas.v2i2
Table of Contents
Articles
ANALISIS PERENCANAAN PERBAIKAN TANAH PADA PEMBANGUNAN JALAN TOL RUAS KUALA TANJUNG - INDERAPURA SEKSI 2 ZONA 1 (STA.0+600 – STA.1+000), SUMATERA UTARA DENGAN METODE KOMBINASI PREFABRICATED VERTICAL DRAIN (PVD), PREFABRICATED HORIZONTAL DRAIN (PHD), DAN PRELOADING
DOI : 10.36294/batas.v2i2.3417
| Abstract views : 119 times
Richard Syatria Adjie, Muhammad Irwansyah, Amir Hamzah
|
1-9
|
EVALUASI METODE PERHITUNGAN DAYA DUKUNG TIANG PANCANG DARI HASIL SPT DAN DATA LABORATORIUM – STUDI KASUS PEMBANGUNAN TANGKI TIMBUN AVTUR 3 x 5000L DI DPPU KUALANAMU
DOI : 10.36294/batas.v2i2.3419
| Abstract views : 90 times
Ihsan Malik, Mahliza Nasution
|
10-18
|
PENGARUH PARKING BADAN JALAN TERHADAP KINERJA RUAS JALAN ( STUDI KASUS: DEPAN PUSAT PERBELANJAAN SWALAYAN ATLANTA)
DOI : 10.36294/batas.v2i2.3422
| Abstract views : 76 times
Nurul Hayati, Alexander Tuahta Sihombing, Intan Zahar
|
19-26
|
ANALISA PERBANDINGAN RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH DINAS POLRES KOTA TANJUNGBALAI DENGAN MENGGUNAKAN METODE SNI 2010 DAN AHSP 2022
DOI : 10.36294/batas.v2i2.3428
| Abstract views : 105 times
Indri Pratiwi, Muhammad Irwansyah, Fynnisa Zebua
|
27-37
|
ANALISIS BIAYA DAN WAKTU PROYEK DALAM PROSES KINERJA DENGAN MENGGUNAKAN METODE EARNED VALUE (STUDI KASUS: PEMBANGUNAN RUMAH DINAS KEJAKSANAAN KOTA TANJUNGBALAI)
DOI : 10.36294/batas.v2i2.3427
| Abstract views : 64 times
Astuti Vidalia
|
38-47
|
PERHITUNGAN KEBUTUHAN AIR BERSIH PDAM TIRTA KUALO KOTA TANJUNGBALAI
DOI : 10.36294/batas.v2i2.3421
| Abstract views : 135 times
Shofa - Sofyan
|
48-57
|