METODE PELAKSANAAN, EFISIENSI BIAYA DAN WAKTU PEKERJAAN GALIAN BATU DENGAN METODE PELEDAKAN (BLASTING) PADA PROYEK JALAN TOL SIGLI – BANDA ACEH SEKSI 1A. (2025). Jurnal Bidang Aplikasi Teknik Sipil Dan Sains (BATAS), 4(2), 10-18. https://doi.org/10.36294/hbhjpd24