(1)
METODE PELAKSANAAN, EFISIENSI BIAYA DAN WAKTU PEKERJAAN GALIAN BATU DENGAN METODE PELEDAKAN (BLASTING) PADA PROYEK JALAN TOL SIGLI – BANDA ACEH SEKSI 1A. J. Bid. Apl. Tek. Sipil dan Sains 2025, 4 (2), 10-18. https://doi.org/10.36294/hbhjpd24.